Launching < 1 weekAll data is test data while we finish the fund platform.

All audits

Veridise · September 2026

Veridise audit

The original review of twelve core contracts. It does not cover later Launchpad, FullRange or token changes.

veridise.pdf · Version 2 · Updated September 17, 2026 · 15 pages

Page 1 of 15: Cover

Original report page 1: Cover. Select Text view to read the page as text.

Original report layout. Switch to Text view for selectable text and easier reading on smaller screens.

Findings and responses

Project responses updated October 9, 2026. Latest inventory: 133 observations including duplicates; 125 accepted, two locally remediated Periphery observations, six deferred in whole or part, zero undecided contract portions. The Periphery fix passed 43 contract and 21 SDK tests; the owner waived its additional independent re-audit, which was not run. Acceptance is not remediation; deferred work stays open.

Project responses updated October 5, 2026. Original reviewer labels are preserved. Accepted risks are not fixes; local verification is separate from independent re-audit. Findings refer to the source revision on this report, not every later contract change.

V-GLZC-VUL-001 — No minimum USDG amount on Strategy buy

Severity: Low.

Original disposition: Acknowledged. No auditor-confirmed fix claimed.

Disposition: Accepted epoch-bound Auction purchase protection; no contract change.

Response: After reviewing the caller-supplied epoch guard and keeping the Auction USDG-only, the owner accepted retaining the existing protections without a minimum-output parameter. This reconfirms the earlier local Veridise disposition and the requirement that integrations preserve the buyer's reviewed epoch.

Remaining work / limits: Keep reviewed-epoch integration requirements explicit in SDK and client documentation. The October 4 confirmation is source-based: Auction.sol:168, packages/sdk/src/actions.ts:587 and apps/web/lib/coin/steps.ts:653, consistent with docs/reviews/veridise-findings-2026-09-15.md. No contract change, new test execution, runtime validation, deployment verification or source-freeze closure is claimed.

V-GLZC-VUL-002 — Direct USDG transfers inflate Strategy Purchased events

Severity: Warning.

Original disposition: Acknowledged. No auditor-confirmed fix claimed.

Disposition: Accepted gross purchased-USDG event semantics; no contract change.

Response: The owner chose to keep the event because its amount describes what the buyer purchased, including any directly donated USDG.

Remaining work / limits: Keep event documentation and analytics labels aligned with gross purchased USDG. No contract or frontend implementation, new test execution, deployment verification or source-freeze closure is claimed.

V-GLZC-VUL-003 — Maintainability Concerns

Severity: Info.

Fix: Maintainability changes acknowledged as fixed by Veridise on report page 15.

Verification: Auditor-confirmed at 741d05b0. See the original report for the specific changes.

<!-- current-followups -->